Sample document — every name, address and signature on this page is fictional. This is what SiteRelay produces for every visit, captured on site with or without signal. Back to siterelay.co.uk

Job sheet

Halloway Electrical Contractors Ltd (sample company)

Customer approved
JobJ1042 — Consumer unit replacement
CustomerFairview Property Group (sample)
SiteUnit 7, Riverside Trade Park, Ipswich IP2 8QQ
EngineerE. Sparks
VisitTuesday 30 June · started 08:04 · completed 15:47
Risk assessmentPOWRA completed on site before work started · 08:01

Work done

Isolated supply and replaced existing 8-way rewireable fuse board with an 18th-edition metal consumer unit (dual RCD, SPD fitted). Tested all circuits — results recorded on EIC. Labelled circuits, refitted trunking lid, left site clean and customer walked through the new board.

Materials used

Extras agreed on site

Replaced corroded main earth bonding clamp to water main — agreed with site manager before fitting. +0.5h labour, 1 × earth clamp.

Time on site

7h 45m (1 engineer) · van used: company vehicle HX21 ZRT — weekly check passed Monday.

Customer sign-off

Signed on device · M. Fairview, Site Manager · Tue 30 Jun, 15:52

“Approved — including the extra earth bonding work listed above.”

Sheet locked at sign-off · dated activity trail retained for audit · exported from SiteRelay